EGB123 Mechanical Engineering|Donnington North

EGB123 Mechanical Engineering|Donnington North
Task B Environment Management The residential catchment of Donnington North in the central west of the suburb of Carindale from Task A above applies to this task. With your team having already determined the number of dwellings in Task A, populate the blank cells in the following Table 3.1 to determine the waste transfer task for Donnington North assuming: one household per dwelling (1hh/dwg) and an average household size of 3.1 persons per dwelling (p/dwg), and the specific values provided in the table. For the bottom two rows, use your engineering judgment and online information available about waste management in Brisbane to identify destinations of collected waste (hint: locations of certain facilities include Acacia Ridge, Chandler, Rochedale, Rocklea). (In each cell, round to nearest: 1 svc, 1 kg/hh-yr, 1 kg/svc-yr, 0.1 kg/svc-clct, 0.01 t/clct, 0.01 load/clct.) How many landfill (red bin waste) RCV loads per week (load/wk) does this neighbourhood produce? Provide comment. How many recyclables (yellow bin waste) RCV loads per fortnight (load/ftnt) does this neighbourhood produce? Provide comment. How many green bin waste RCV loads per fortnight (load/ftnt) does this neighbourhood produce? Provide comment. How many kerbside collection loads by type (light pickup/ trailer, medium rigid truck in respective columns) (pre COVID-19) does this neighbourhood produce per annual collection event (load/yr)? Provide comment.
Read less
QUALITY: 100% ORIGINAL PAPER – NO PLAGIARISM – CUSTOM PAPER
error: Content is protected !!