EET 216 Digital Circuits-specifications for your groups motor

EET 216 Digital Circuits-specifications for your groups motor

$20 Bonus + 25% OFF

Securing Higher Grades Costing Your Pocket?
Book Your Assignment at The Lowest Price
Now!

Students Who Viewed This Also Studied

EET 216 Digital Circuits

Task:

Scope:

Your group is to determine the cable route, type of installation, size of wire, motor type, capacitor configuration, starter type,short circuit currents and motor controller wiring. Please include any relevant code references.

1) Create a cable route diagram. Determine cable route (Conductor length / path) from “Disconnect 3” as seen located above splitter on print E8 to the motor location assigned by your instructor.

2) Research and include specifications for your groups motor. Specifications should include information on the motors FLA, Operating Voltage, Service Factor, Efficiency, Insulation rating, expected power factor under fully loaded operating conditions. (In the event that your specifications are missing some of the required information a calculation may be used to determine the missing information – be sure to include this calculation in your report). Please note, the proposed motor must operate at the voltage level supplied from T-103

3) Calculate capacitor size and configuration needed to correct the motor from the power factor indicated in your specs to a 95% pf. (See Unit 14 in EWI) (assume motor will be fully loaded and capacitors will be connected to the load side of the motor overload device)

4) Determine the conductor size and type for installing your motor and capacitors (see Unit 10 in EWI).

a) Calculations must show that your conductors conform to code rule 8-102 CEC for maximum voltage drop (Unit 7 of your industrial prints book pages 107 through 109 using CEC Table D3)

b) Please note your conductor sizes are subject to the termination temperature limitations as noted in code rule 4-006 CEC (assume a marked termination temperature at disconnect and motor controller of 75 deg C).

c) Assume capacitors are connected to the load side of the motor controller (26-218).

5) Calculate fuse and overload sizes based on your motor specifications and applicable code rules.

Verify disconnect is sufficient size. (See Unit 10 in EWI)

Because capacitors are used, consider 26-218 when calculating Overload setting.

6) Calculate conduit and fitting sizes for your conductors. (Include Identified conductor if you have one)

7) Complete a calculation for cable pull tension. Include bond and identified conductor if used. See example from Unit 3 pages 62 to 63 of the industrial prints book.

8) Create and include a control-wiring diagram and power-wiring diagram that allows for stop, start and reverse of the motor. (The pf correction capacitors should be shown on the power wiring diagram)

9) Create a Material list that includes amount of conduit, cable, fittings, boxes, connectors, support material, etc. Please include equipment needed to install the material. (prices not required)

10) Complete a short circuit calculation at motor from Service A 

EET 216 Digital Circuits

Answer in Detail


Solved by qualified expert

Get Access to This Answer

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Hac habitasse platea dictumst vestibulum rhoncus est pellentesque. Amet dictum sit amet justo donec enim diam vulputate ut. Neque convallis a cras semper auctor neque vitae. Elit at imperdiet dui accumsan. Nisl condimentum id venenatis a condimentum vitae sapien pellentesque. Imperdiet massa tincidunt nunc pulvinar sapien et ligula. Malesuada fames ac turpis egestas maecenas pharetra convallis posuere. Et ultrices neque ornare aenean euismod. Suscipit tellus mauris a diam maecenas sed enim. Potenti nullam ac tortor vitae purus faucibus ornare. Morbi tristique senectus et netus et malesuada. Morbi tristique senectus et netus et malesuada. Tellus pellentesque eu tincidunt tortor aliquam. Sit amet purus gravida quis blandit. Nec feugiat in fermentum posuere urna. Vel orci porta non pulvinar neque laoreet suspendisse interdum. Ultricies tristique nulla aliquet enim tortor at auctor urna. Orci sagittis eu volutpat odio facilisis mauris sit amet.

Tellus molestie nunc non blandit massa enim nec dui. Tellus molestie nunc non blandit massa enim nec dui. Ac tortor vitae purus faucibus ornare suspendisse sed nisi. Pharetra et ultrices neque ornare aenean euismod. Pretium viverra suspendisse potenti nullam ac tortor vitae. Morbi quis commodo odio aenean sed. At consectetur lorem donec massa sapien faucibus et. Nisi quis eleifend quam adipiscing vitae proin sagittis nisl rhoncus. Duis at tellus at urna condimentum mattis pellentesque. Vivamus at augue eget arcu dictum varius duis at. Justo donec enim diam vulputate ut. Blandit libero volutpat sed cras ornare arcu. Ac felis donec et odio pellentesque diam volutpat commodo. Convallis a cras semper auctor neque. Tempus iaculis urna id volutpat lacus. Tortor consequat id porta nibh.

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Hac habitasse platea dictumst vestibulum rhoncus est pellentesque. Amet dictum sit amet justo donec enim diam vulputate ut. Neque convallis a cras semper auctor neque vitae. Elit at imperdiet dui accumsan. Nisl condimentum id venenatis a condimentum vitae sapien pellentesque. Imperdiet massa tincidunt nunc pulvinar sapien et ligula. Malesuada fames ac turpis egestas maecenas pharetra convallis posuere. Et ultrices neque ornare aenean euismod. Suscipit tellus mauris a diam maecenas sed enim. Potenti nullam ac tortor vitae purus faucibus ornare. Morbi tristique senectus et netus et malesuada. Morbi tristique senectus et netus et malesuada. Tellus pellentesque eu tincidunt tortor aliquam. Sit amet purus gravida quis blandit. Nec feugiat in fermentum posuere urna. Vel orci porta non pulvinar neque laoreet suspendisse interdum. Ultricies tristique nulla aliquet enim tortor at auctor urna. Orci sagittis eu volutpat odio facilisis mauris sit amet.

Tellus molestie nunc non blandit massa enim nec dui. Tellus molestie nunc non blandit massa enim nec dui. Ac tortor vitae purus faucibus ornare suspendisse sed nisi. Pharetra et ultrices neque ornare aenean euismod. Pretium viverra suspendisse potenti nullam ac tortor vitae. Morbi quis commodo odio aenean sed. At consectetur lorem donec massa sapien faucibus et. Nisi quis eleifend quam adipiscing vitae proin sagittis nisl rhoncus. Duis at tellus at urna condimentum mattis pellentesque. Vivamus at augue eget arcu dictum varius duis at. Justo donec enim diam vulputate ut. Blandit libero volutpat sed cras ornare arcu. Ac felis donec et odio pellentesque diam volutpat commodo. Convallis a cras semper auctor neque. Tempus iaculis urna id volutpat lacus. Tortor consequat id porta nibh.

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Hac habitasse platea dictumst vestibulum rhoncus est pellentesque. Amet dictum sit amet justo donec enim diam vulputate ut. Neque convallis a cras semper auctor neque vitae. Elit at imperdiet dui accumsan. Nisl condimentum id venenatis a condimentum vitae sapien pellentesque. Imperdiet massa tincidunt nunc pulvinar sapien et ligula. Malesuada fames ac turpis egestas maecenas pharetra convallis posuere. Et ultrices neque ornare aenean euismod. Suscipit tellus mauris a diam maecenas sed enim. Potenti nullam ac tortor vitae purus faucibus ornare. Morbi tristique senectus et netus et malesuada. Morbi tristique senectus et netus et malesuada. Tellus pellentesque eu tincidunt tortor aliquam. Sit amet purus gravida quis blandit. Nec feugiat in fermentum posuere urna. Vel orci porta non pulvinar neque laoreet suspendisse interdum. Ultricies tristique nulla aliquet enim tortor at auctor urna. Orci sagittis eu volutpat odio facilisis mauris sit amet.

Tellus molestie nunc non blandit massa enim nec dui. Tellus molestie nunc non blandit massa enim nec dui. Ac tortor vitae purus faucibus ornare suspendisse sed nisi. Pharetra et ultrices neque ornare aenean euismod. Pretium viverra suspendisse potenti nullam ac tortor vitae. Morbi quis commodo odio aenean sed. At consectetur lorem donec massa sapien faucibus et. Nisi quis eleifend quam adipiscing vitae proin sagittis nisl rhoncus. Duis at tellus at urna condimentum mattis pellentesque. Vivamus at augue eget arcu dictum varius duis at. Justo donec enim diam vulputate ut. Blandit libero volutpat sed cras ornare arcu. Ac felis donec et odio pellentesque diam volutpat commodo. Convallis a cras semper auctor neque. Tempus iaculis urna id volutpat lacus. Tortor consequat id porta nibh.

12 More Pages to Come in This Document. Get access to the complete answer.

MyAssignmenthelp.com makes sure that each writer is screened through rigorous tests to evaluate their academic credentials. If you are stuck in middle of the assignment, or not even started your dissertation, get your work done from MyAssignmenthelp.com. custom essays, online assignment help, dissertation writing services are the regular offering at MyAssignmenthelp.com. Our responsibility does not finish with writing, rather advance with complete proofread and editing. Don’t hesitate to reach us if the delivered content is not satisfying, MyAssignmenthelp.com provides unlimited revisions and amendments. homework help from UK, USA, Australia and from rest of the countries are greeted with warmth. Get your first free quote from MyAssignmenthelp.com via telephone, mail us directly or have a chat with us live. Get our 100 percent worthy services to reach a step nearer to success.

More EET216 EET 216 Digital Circuits: Questions & Answers

i have applied for advance standing in course project 1, project 2, engineering management i am doing masters in electrical engineering. so to get recognition i need to submit three reports for each unit covering contents of each unit justifying that i have achieve experience prior to learning i am …

View Answer

3-1 Discussion: Finding and Analyzing Scientific Sources This module’s webtext focused on researching your issue in the natural sciences and evaluating different sources. In your initial post, explain what the biggest challenge you faced was when trying to find sources? What challenges did you …

View Answer

QUESTION 1. What are transients and suggest specific means of eliminating them from Power System?QUESTION 2.) Figure 1 shows a single-line diagram of a five-bus power system. Input data are given in Tables 1, 2 and 3. As shown in table 1, bus 1, to which a generator is connected, is the sw …

View Answer

Task:
1.Use the provided data and draw the one-line diagram using the SKM program
2.Hand calculate transformer T1 full load ampere at the secondary 480V side. Show your work
Utility Mode:
3.With the 150 kVAR capacitor bank connected to the switchboard bus, and the Cap. Switch is Normally Open (N …

View Answer

Content Removal Request

If you are the original writer of this content and no longer wish to have your work published on Myassignmenthelp.com then please raise the
content removal request.

Choose Our Best Expert to Help You





Cora Rosario

MSC in Advanced Computer Science from School of Computing, University of Kent

300 – Completed Orders

Hire Me

Still in Two Minds? The Proof is in Numbers!

33845 Genuine Reviews With a Rating of 4.9/5.

English

Essay: 4 Pages, Deadline:
9 days

Very good paper, included everything and helpful. I got a grade on the essay, received a 100 on my paper. I highly recommend this website!

User ID: 6***89 United States

Marketing

Assignment: 10 Pages, Deadline:
11 days

Excellent job. Very timely. Customer service was top-notch. Even my lecturer was impressed.

User ID: 8***83 Canada

Management

Assignment: 7 Pages, Deadline:
9 days

I am very happy when I get marks I feel very verry good I got good marks thank u so much for helping me

User ID: 5***67 Canada

Project Management

Essay: 9 Pages, Deadline:
1 day

was a part of my programme management curs level 5 i passed it with 85% and that is soo good for me, thank you

User ID: 7***04 Birmingham, Great Britain

Management

Thesis: 1.8 Pages, Deadline:
6 days

Very good job I am very happy when I get marks I very very happy thank u so much for helping me

User ID: 5***67 Canada

Mechanical Engineering

Programming: 6 Pages, Deadline:
15 days

was in time good experience, hope would have scored good grades. Good maintained and very much friendly service.

User ID: 6***39 United Kingdom, Great Britain

Management

Essay: 6 Pages, Deadline:
5 days

excellent work thank you i will always use this website and tell and advise my friends and colleagues about you guys but there must be more discounts …

User ID: 7***75 Kuwait

HRM

Programming: 2 Pages, Deadline:
4 days

all work done well with good referencing and proper words i got a very good score for this particular course and i am happy about that. thank you so …

User ID: 8***18 United Kingdom, Great Britain

HRM

Assignment: 3.6 Pages, Deadline:
3 days

submitted my work and the lecture acknowledge my work saying that it was good and i did a very good work.

User ID: 8***18 United Kingdom, Great Britain

Management

Assignment: 16 Pages, Deadline:
16 days

Very supporting and helpful, I am happy to express that the assignment and writing is very good and helped me to achieve good achievement in study.

User ID: 4***58 Malaysia

English

Essay: 4 Pages, Deadline:
9 days

Very good paper, included everything and helpful. I got a grade on the essay, received a 100 on my paper. I highly recommend this website!

User ID: 6***89 United States

Marketing

Assignment: 10 Pages, Deadline:
11 days

Excellent job. Very timely. Customer service was top-notch. Even my lecturer was impressed.

User ID: 8***83 Canada

Management

Assignment: 7 Pages, Deadline:
9 days

I am very happy when I get marks I feel very verry good I got good marks thank u so much for helping me

User ID: 5***67 Canada

Project Management

Essay: 9 Pages, Deadline:
1 day

was a part of my programme management curs level 5 i passed it with 85% and that is soo good for me, thank you

User ID: 7***04 Birmingham, Great Britain

Management

Thesis: 1.8 Pages, Deadline:
6 days

Very good job I am very happy when I get marks I very very happy thank u so much for helping me

User ID: 5***67 Canada

Mechanical Engineering

Programming: 6 Pages, Deadline:
15 days

was in time good experience, hope would have scored good grades. Good maintained and very much friendly service.

User ID: 6***39 United Kingdom, Great Britain

Management

Essay: 6 Pages, Deadline:
5 days

excellent work thank you i will always use this website and tell and advise my friends and colleagues about you guys but there must be more discounts …

User ID: 7***75 Kuwait

HRM

Programming: 2 Pages, Deadline:
4 days

all work done well with good referencing and proper words i got a very good score for this particular course and i am happy about that. thank you so …

User ID: 8***18 United Kingdom, Great Britain

HRM

Assignment: 3.6 Pages, Deadline:
3 days

submitted my work and the lecture acknowledge my work saying that it was good and i did a very good work.

User ID: 8***18 United Kingdom, Great Britain

Management

Assignment: 16 Pages, Deadline:
16 days

Very supporting and helpful, I am happy to express that the assignment and writing is very good and helped me to achieve good achievement in study.

User ID: 4***58 Malaysia

Have any Query?

QUALITY: 100% ORIGINAL PAPER – NO PLAGIARISM – CUSTOM PAPER
error: Content is protected !!